The Remodeling Journal / St. Johns County, FL
Garden tubs out, walk-in showers in. A practical guide to bathroom remodeling in St. Johns County, with a real project from our team.

In St. Johns, the bathroom is usually the room that ages fastest, and the one homeowners use most.
Thousands of homes in Julington Creek, Fruit Cove and along the State Road 13 corridor were built with the same primary bath: a corner garden tub nobody uses, a small fiberglass or framed shower, cultured-marble vanity tops and 12×12 ceramic tile. In newer neighborhoods like RiverTown and Durbin Crossing the finishes are fresher, but the shower is often a builder-grade unit with a curb and a single shower head.
This guide covers what a bathroom remodel in St. Johns, FL really involves, what it costs in 2026 and how we build showers that survive Florida humidity. For our full service overview, see bathroom remodeling in Jacksonville.
Quick answer
How much does bathroom remodeling cost in St. Johns, FL?
Most full bathroom remodels in St. Johns County run $12,000–$22,000 for a mid-range guest or hall bath and $22,000–$35,000+ for a primary bathroom. Projects that move the tub, enlarge the shower or add custom glass and stone can go higher. Our 2026 bathroom remodel cost guide breaks down every line item.
What St. Johns homeowners are asking for
Replace the garden tub with a walk-in shower
This is the number one request we hear in Julington Creek Plantation, Bartram Plantation and Brookstone. Removing the corner tub frees up space for a large walk-in shower with a bench, a niche and a handheld shower. If you still want to soak, a freestanding tub in a smaller footprint is the common compromise. More layouts in our walk-in shower ideas.
Double vanities with real storage
Cultured-marble tops and builder-grade cabinets are replaced with furniture-style or floating vanities, quartz tops and undermount sinks. Many clients add a tall linen cabinet or a makeup station.
Low-maintenance, slip-resistant tile
Large-format porcelain on walls means fewer grout lines to clean. On shower floors we use smaller tiles or textured porcelain so the floor slopes properly to the drain and stays slip resistant.
A real bathroom remodel in St. Johns, FL
This primary bathroom in St. Johns shows what a full remodel looks like when it is planned around how the homeowners actually live. The original bathroom had wallpaper, a dark vanity and a cramped shower stall. The project included a new glass-enclosed walk-in shower with a recessed niche, a freestanding soaking tub, two new painted vanities with warm brass fixtures and lighting, and large-format tile throughout.


Before and after: a primary bathroom remodel by Nunes 4 Flooring in St. Johns, FL.


Freestanding tub, his-and-hers vanities and the walk-in shower in the same St. Johns project.
Behind the tile, the shower was built with a bonded waterproofing system, the same approach described in our guide to Schluter KERDI waterproofing for Florida showers. For niche placement and tile alignment tips, see our shower niche and tile layout guide.
2026 bathroom remodeling costs in St. Johns County
| Project | Typical range | Typical timeline on site |
|---|---|---|
| Cosmetic refresh (vanity, fixtures, paint, lighting) | $4,000–$8,000 | 3–5 days |
| Guest or hall bath, full remodel | $12,000–$22,000 | 2–3 weeks |
| Tub-to-shower conversion | $7,000–$12,000 | 5–10 working days |
| Primary bathroom remodel | $22,000–$35,000+ | 3–5 weeks |
The biggest cost drivers are moving plumbing, the size of the shower, glass, and tile choice. Natural stone costs more to buy and to maintain; porcelain that looks like marble gives a similar result for less. Considering just the tub? Our tub-to-shower conversion guide covers that project in detail.
Building for Florida humidity
St. Johns County bathrooms deal with heat and humidity most of the year. A remodel that ignores moisture will look good for a year and then start to fail. These are the details we never skip:
- Bonded waterproofing: Schluter KERDI membrane or KERDI-BOARD on shower walls, with a sloped KERDI shower tray and properly sealed niches and benches.
- Correct drainage: a consistent slope to a center or linear drain so water never sits in the corners.
- Ventilation: an exhaust fan sized for the room and ducted outside, not into the attic.
- Moisture-resistant materials: porcelain tile, solid-surface or quartz tops and vanities built to handle humidity.
Why it matters: most of the shower failures we repair in Northeast Florida come from missing or broken waterproofing, not from bad tile. We are Schluter Certified, and it is one of the reasons homeowners in St. Johns call us.
Communities we serve in St. Johns and Fruit Cove
- Brookstone
- Roland’s Way
- The Parkes of Julington
- Glen Laurel
- Bartram Plantation
- Victoria Preserve
- Julington Creek Plantation
- Durbin Crossing
- RiverTown
- Fruit Cove
- Switzerland
- Nocatee
Planning a kitchen too? Read our companion guide to kitchen remodeling in St. Johns, FL.
Permits, HOA rules and the remodel timeline
When a bathroom remodel moves plumbing, adds electrical circuits or changes walls, St. Johns County typically requires a permit and inspections. A like-for-like vanity or fixture swap often does not. We check the scope, pull the permit when needed and schedule the inspections. You can read more in our article on bathroom remodel permits.
Your HOA may also have rules about dumpsters, contractor parking and work hours. We plan for those from the start.
- Design and selections: 1–3 weeks, including tile, glass and vanity orders.
- Demolition and rough plumbing/electrical: 2–4 days, plus inspection.
- Waterproofing and tile: 1–2 weeks depending on size.
- Vanity, fixtures and glass: frameless glass is measured after tile and installed about 1–2 weeks later.
How to choose a bathroom remodeler in St. Johns
- Ask what waterproofing system they use, and whether they are certified to install it.
- Ask to see finished showers, not just finished bathrooms.
- Get a written scope that lists tile, waterproofing, plumbing fixtures and glass separately.
- Confirm license and insurance, and who will be on site every day.
Avoid the most common pitfalls with our list of bathroom remodeling mistakes Jacksonville homeowners make.
Frequently asked questions
Can I replace my garden tub with a walk-in shower?
Yes. It is the most common bathroom project in St. Johns. The tub is removed, the floor and drain are reworked, and a waterproofed walk-in shower is built in its place. If you want to keep a tub, a freestanding tub can often fit nearby.
How long does a primary bathroom remodel take?
Plan on 3–5 weeks on site for a primary bathroom, plus 1–3 weeks of design and ordering. Guest baths usually take 2–3 weeks.
Do you remodel bathrooms in Brookstone and Roland’s Way?
Yes. We remodel bathrooms across St. Johns and Fruit Cove, including Brookstone, Roland’s Way, The Parkes of Julington, Glen Laurel, Bartram Plantation, Victoria Preserve, RiverTown and Durbin Crossing.
What is the best shower waterproofing for Florida?
A bonded sheet membrane system such as Schluter KERDI, installed as a complete system with a sloped tray, sealed seams and sealed niches, is one of the most reliable approaches for Florida humidity.
Ready to remodel your bathroom in St. Johns?
Schedule a free in-home estimate with Nunes 4 Flooring Corp. We will walk the space with you and give you a clear written scope and price.
Get a Free EstimateCall (904) 479-1447